- Postcode districts
- SY1, SY2, SY3
- Nearby
- Wellington, Telford and Oswestry
- Guide price
- £900–£2,400
- Typical time on site
- 1–2 working days
- Water
- Moderately hard across most of Shropshire
- Survey
- Free, at your home
What does a replacement bath cost in Shrewsbury?
In Shrewsbury, a replacement bath typically costs £900–£2,400 including VAT, based on West Midlands prices. The figure depends on the size of the room, whether anything moves, and the products you pick.
Like-for-like bath
- Old bath removed and disposed of
Shower bath
- Bath screen and shower
Freestanding bath
- Floor reinforcement check
Guide prices for Shrewsbury including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Shrewsbury
We work right across Shrewsbury — SY1, SY2 and SY3 — and in neighbouring Wellington and Telford.
Shrewsbury has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. Landlords with properties in Shrewsbury can usually have a bath replaced between tenancies in one to two working days. Before a new bath is ordered for a Shrewsbury home, we measure the stairs and landing as well as the opening.
Supplies across most of Shropshire are moderately hard. Taps and wastes will need an occasional descale, and chrome or brushed finishes are easier to keep clean than polished brass. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Tile repairs or re-tiling around the bath, and a fixed screen where there is a shower over it
- Supply of the new bath, taps or filler, waste and overflow, and bath panel
- Levelling the bath on adjustable feet or a cradle, with timber battens fixed to the walls under the rim
- A survey of the bath opening, the floor, the waste route, the supplies and the tiles around the bath
Decisions to make first
Size
Most UK baths are 1700 × 700 mm. Going longer or wider than the old bath means re-tiling and checking that the new one fits up the stairs.
Bath panel
Acrylic panels are cheap and easy to clean; wood-effect panels match fitted furniture; a tiled panel on a frame looks built-in but needs an access hatch for the waste.
Rules that apply in England
In England, Part G limits the hot water to a new bath to 48 °C at the outlet, usually with a thermostatic mixing valve, but only in a new dwelling or one created by a change of use. It does not apply to a replacement bath in an existing home, though a thermostatic valve is still sensible where children or older people bathe. New wiring for a shower over the bath or new lights is notifiable under Part P.

