- Postcode districts
- NG34
- Nearby
- Grantham, Boston and Lincoln
- Guide price
- £1,900–£4,800
- Typical time on site
- 2–6 working days
- Water
- Hard across most of Lincolnshire
- Survey
- Free, at your home
What does a bath to shower conversion cost in Sleaford?
Guide price in Sleaford: £1,900–£4,800 including VAT, depending on the room and what you choose. Labour costs in East Midlands put local prices at about 4% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Tray and enclosure
- Thermostatic shower, re-tiling
Walk-in shower
- Large tray and frameless screen
Level-access floor
- Level entry, linear drain
Guide prices for Sleaford including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Sleaford
As well as Sleaford itself (NG34), we survey in Grantham, Boston and Lincoln.
Being a smaller town does not change how we work in Sleaford: free survey, written quote, one team. We check the floor under the bath during a Sleaford survey where we can, because old leaks can leave soft boards. If your Sleaford bathroom was refitted recently and you like the rest of it, we can convert just the bath area and finish the new tiling neatly against the old.
Most of Lincolnshire has hard water. If your supply in Sleaford is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Boarding, tanking and re-tiling of the shower walls
- A glass enclosure, walk-in panel or frameless screen
- Grab rails and a fold-down seat if you want them
- Repair or replacement of floorboards where the bath has left them soft or damaged
Decisions to make first
Your only bath?
If this is the only bath in the house, think about whether you, or a future buyer, will want one before you commit.
Safety extras
A fold-down seat, grab rails and a slip-resistant tray cost little at the time of fitting and are much harder to add later.
Rules that apply in England
In England, adding an electric shower usually means a new circuit, which is notifiable under Part P, as is any change to the wiring in the bathroom. Where the conversion is an adaptation for a disabled person, a Disabled Facilities Grant of up to £30,000 may help, but the council must approve it before work starts.

