Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
South Yorkshire · S25

Bath to shower conversions in Maltby

Looking for a bath to shower conversion in Maltby? We design, supply and fit bathrooms across South Yorkshire, starting with a free home survey and an itemised written quote.

£1,850–£4,600 inc VAT2–6 working daysFree home survey
Former bath space converted to a walk-in shower, example for Maltby
Postcode districts
S25, S66
Nearby
Dinnington, Conisbrough and Rotherham
Guide price
£1,850–£4,600
Typical time on site
2–6 working days
Water
Moderately hard across most of South Yorkshire
Survey
Free, at your home

What does a bath to shower conversion cost in Maltby?

Guide price in Maltby: £1,850–£4,600 including VAT, depending on the room and what you choose. Prices in Yorkshire and the Humber run at about 7% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.

Walk-in shower

£2,800–£5,100
  • Full-height tiling

Level-access floor

£4,200–£7,400
  • Floor former and tanking

Guide prices for Maltby including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Maltby

We work right across Maltby — S25 and S66 — and in neighbouring Dinnington and Conisbrough.

Being a smaller town does not change how we work in Maltby: free survey, written quote, one team. We check the floor under the bath during a Maltby survey where we can, because old leaks can leave soft boards. If someone in your Maltby home is finding the bath side harder to step over, a low or level-access tray removes the problem.

Supplies across most of South Yorkshire are moderately hard. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Maltby. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Repair or replacement of floorboards where the bath has left them soft or damaged
  • A survey of the bath space, the waste position, the floor and your water system
  • Silicone, a full-flow test and a tidy finish where the new tiling meets the old
  • Removal of the bath, panel and taps, and disposal of the waste

Decisions to make first

How much to re-tile

Re-tile just the shower walls, or take the chance to re-tile the whole room so new and old tiles never have to match.

Low tray or level floor

A low-profile tray has a small lip. A level-access floor removes the step altogether but needs a former, tanking and a linear drain.

Rules that apply in England

In England, adding an electric shower usually means a new circuit, which is notifiable under Part P, as is any change to the wiring in the bathroom. Where the conversion is an adaptation for a disabled person, a Disabled Facilities Grant of up to £30,000 may help, but the council must approve it before work starts.

More about bath to shower conversions

Bath to shower conversions in Maltby: questions

How much does a bath to shower conversion cost in Maltby?

A bath to shower conversion in Maltby usually costs £1,850–£4,600 including VAT. Expect the lower end for a like-for-like job with standard products, and the upper end if things move or you choose premium finishes. Your quote is itemised and fixed in writing once agreed.

Do you cover S25 and S66 in Maltby?

Yes. We cover all of Maltby, including S25 and S66, and nearby Dinnington, Conisbrough and Rotherham. Survey visits are free and arranged at a time that suits you.

Is the water hard in Maltby?

Supplies across most of South Yorkshire are moderately hard. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Maltby. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Who handles building control for a bath to shower conversion in Maltby?

Building control for Maltby is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

Can I keep my existing tiles?

Rarely around the shower itself. Taking the bath out usually damages the bottom rows of tiles, and the shower walls need tanking before tiling, so the shower area is re-tiled. Tiles elsewhere in the room can often stay; matching an old tile is hard, so a deliberately contrasting shower tile is often the neater answer.

Bath to shower conversions in Maltby

Book a free home survey in Maltby. You get a measured layout and an itemised written price before anything is ordered.