- Postcode districts
- HP11, HP12, HP13
- Nearby
- Marlow, Amersham and Amersham on the Hill
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Buckinghamshire
- Survey
- Free, at your home
What does a new bathroom design cost in High Wycombe?
Design comes with the job: the survey, layout and itemised quote are free. In High Wycombe, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for High Wycombe including VAT. Your itemised written quote after the free survey is the price that counts.
Working in High Wycombe
We work right across High Wycombe — HP11, HP12 and HP13 — and in neighbouring Marlow and Amersham.
High Wycombe has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. We measure High Wycombe bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan. Whether you are in High Wycombe or elsewhere in Buckinghamshire, layout options come with an itemised written quote.
Supplies across most of Buckinghamshire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- A conversation about who uses the room, when, and what does not work about the current one
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

