- Postcode districts
- BH6, BH7, BH23
- Nearby
- Bournemouth, New Milton and Ferndown
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Dorset
- Survey
- Free, at your home
What does a new bathroom design cost in Christchurch?
Design comes with the job: the survey, layout and itemised quote are free. In Christchurch, a complete designed, supplied and fitted bathroom typically costs £6,600–£12,250 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Christchurch including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Christchurch
We cover every part of Christchurch, including BH6, BH7 and BH23, and nearby Bournemouth (4.4 miles) and New Milton (5.2 miles).
In Christchurch, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If your Christchurch bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move. Whether you are in Christchurch or elsewhere in Dorset, layout options come with an itemised written quote.
Most of Dorset has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A conversation about who uses the room, when, and what does not work about the current one
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

