- Postcode districts
- DD1, DD2, DD3, DD4, DD5
- Nearby
- Carnoustie, St Andrews and Forfar
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of Dundee and Angus
- Survey
- Free, at your home
What does a new bathroom design cost in Dundee?
Design comes with the job: the survey, layout and itemised quote are free. In Dundee, a complete designed, supplied and fitted bathroom typically costs £6,200–£11,500 including VAT. Prices in Scotland run at about 4% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Dundee including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Dundee
We work right across Dundee — DD1, DD2, DD3 and 2 more postcode districts — and in neighbouring Carnoustie and St Andrews.
In a city the size of Dundee, parking and access for a skip are worth sorting before the start date — we will ask at the survey. We measure Dundee bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan. A design survey in Dundee covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork.
Supplies across most of Dundee and Angus are soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A conversation about who uses the room, when, and what does not work about the current one
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
Decisions to make first
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in Scotland
In Scotland, a straight refit rarely needs a building warrant, but forming a new bathroom, altering drainage or structural work may. The Technical Handbook uses 15 l/s extract for a bathroom, and the Scottish Water Byelaws 2014 cover new water fittings.

