- Postcode districts
- TN34, TN35, TN37, TN38
- Nearby
- Bexhill-on-Sea, Hailsham and Eastbourne
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of East Sussex
- Survey
- Free, at your home
What does a new bathroom design cost in Hastings?
Design comes with the job: the survey, layout and itemised quote are free. In Hastings, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Hastings including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Hastings
We cover every part of Hastings, including TN34, TN35, TN37 and 1 more postcode districts, and nearby Bexhill-on-Sea (4.8 miles) and Hailsham (14.1 miles).
Across a large town like Hastings, homes range from older terraces to newer estates; the survey tells us which pipework and floor we are dealing with. For loft rooms and sloping ceilings in Hastings homes, the design checks head height where you stand, not just the floor area. If you are in Hastings and weighing a bath against a walk-in shower, the layout options show both with their prices.
Water across much of East Sussex is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

