- Postcode districts
- BN10
- Nearby
- Rottingdean, Seaford and Lewes
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of East Sussex
- Survey
- Free, at your home
What does a new bathroom design cost in Peacehaven?
Design comes with the job: the survey, layout and itemised quote are free. In Peacehaven, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Peacehaven including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Peacehaven
We cover every part of Peacehaven, including BN10, and nearby Rottingdean (2.6 miles) and Seaford (5 miles).
Being a smaller town does not change how we work in Peacehaven: free survey, written quote, one team. Whether you are in Peacehaven or elsewhere in East Sussex, layout options come with an itemised written quote. If your Peacehaven bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Most of East Sussex has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

