- Postcode districts
- SS13, SS14, SS15, SS16
- Nearby
- Pitsea, Stanford-le-Hope and Wickford
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Essex
- Survey
- Free, at your home
What does a new bathroom design cost in Basildon?
Design comes with the job: the survey, layout and itemised quote are free. In Basildon, a complete designed, supplied and fitted bathroom typically costs £6,900–£12,750 including VAT. Labour costs in East of England put local prices at about 6% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Basildon including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Basildon
We cover every part of Basildon, including SS13, SS14, SS15 and 1 more postcode districts, and nearby Pitsea (2.2 miles) and Stanford-le-Hope (3.3 miles).
Basildon has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. Whether you are in Basildon or elsewhere in Essex, layout options come with an itemised written quote. For loft rooms and sloping ceilings in Basildon homes, the design checks head height where you stand, not just the floor area.
Supplies across most of Essex are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
Decisions to make first
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

