- Postcode districts
- CO13, CO14
- Nearby
- Frinton-on-Sea, Clacton-on-Sea and Harwich
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Essex
- Survey
- Free, at your home
What does a new bathroom design cost in Walton-on-the-Naze?
Design comes with the job: the survey, layout and itemised quote are free. In Walton-on-the-Naze, a complete designed, supplied and fitted bathroom typically costs £6,900–£12,750 including VAT. Labour costs in East of England put local prices at about 6% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Walton-on-the-Naze including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Walton-on-the-Naze
We work right across Walton-on-the-Naze — CO13 and CO14 — and in neighbouring Frinton-on-Sea and Clacton-on-Sea.
Walton-on-the-Naze gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If you are in Walton-on-the-Naze and weighing a bath against a walk-in shower, the layout options show both with their prices. Whether you are in Walton-on-the-Naze or elsewhere in Essex, layout options come with an itemised written quote.
Supplies across most of Essex are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A conversation about who uses the room, when, and what does not work about the current one
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

