- Postcode districts
- OL1, OL2, OL9
- Nearby
- Chadderton, Oldham and Middleton
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of Greater Manchester
- Survey
- Free, at your home
What does a new bathroom design cost in Royton?
Design comes with the job: the survey, layout and itemised quote are free. In Royton, a complete designed, supplied and fitted bathroom typically costs £6,100–£11,250 including VAT. Prices in North West England run at about 6% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Royton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Royton
We work right across Royton — OL1, OL2 and OL9 — and in neighbouring Chadderton and Oldham.
Being a smaller town does not change how we work in Royton: free survey, written quote, one team. We measure Royton bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan. For loft rooms and sloping ceilings in Royton homes, the design checks head height where you stand, not just the floor area.
Supplies across most of Greater Manchester are soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

