- Postcode districts
- M27, M28, M30
- Nearby
- Eccles, Walkden and Salford
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of Greater Manchester
- Survey
- Free, at your home
What does a new bathroom design cost in Swinton?
Design comes with the job: the survey, layout and itemised quote are free. In Swinton, a complete designed, supplied and fitted bathroom typically costs £6,100–£11,250 including VAT. We adjust the national guide for North West England, where prices are typically about 6% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Swinton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Swinton
We work right across Swinton — M27, M28 and M30 — and in neighbouring Eccles and Walkden.
Being a smaller town does not change how we work in Swinton: free survey, written quote, one team. For loft rooms and sloping ceilings in Swinton homes, the design checks head height where you stand, not just the floor area. A design survey in Swinton covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork.
Supplies across most of Greater Manchester are soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- A clear view of which changes are cheap and which mean moving drainage or opening floors
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

