- Postcode districts
- BL5
- Nearby
- Atherton, Hindley and Tyldesley
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of Greater Manchester
- Survey
- Free, at your home
What does a new bathroom design cost in Westhoughton?
Design comes with the job: the survey, layout and itemised quote are free. In Westhoughton, a complete designed, supplied and fitted bathroom typically costs £6,100–£11,250 including VAT. Labour costs in North West England put local prices at about 6% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Westhoughton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Westhoughton
As well as Westhoughton itself (BL5), we survey in Atherton, Hindley and Tyldesley.
In Westhoughton, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. A design survey in Westhoughton covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. If you are in Westhoughton and weighing a bath against a walk-in shower, the layout options show both with their prices.
Supplies across most of Greater Manchester are soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- A conversation about who uses the room, when, and what does not work about the current one
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
Decisions to make first
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

