- Postcode districts
- SP10
- Nearby
- Winchester, Newbury and Romsey
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does a new bathroom design cost in Andover?
Design comes with the job: the survey, layout and itemised quote are free. In Andover, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Andover including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Andover
In Andover we cover SP10; we also cover Winchester, 12.6 miles away, and Newbury.
In Andover, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. Whether you are in Andover or elsewhere in Hampshire, layout options come with an itemised written quote. For loft rooms and sloping ceilings in Andover homes, the design checks head height where you stand, not just the floor area.
Most of Hampshire has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

