- Postcode districts
- EN6, WD2, WD23
- Nearby
- Barnet, Enfield and Borehamwood
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Hertfordshire
- Survey
- Free, at your home
What does a new bathroom design cost in Potters Bar?
Design comes with the job: the survey, layout and itemised quote are free. In Potters Bar, a complete designed, supplied and fitted bathroom typically costs £6,900–£12,750 including VAT. We adjust the national guide for East of England, where prices are typically about 6% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Potters Bar including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Potters Bar
As well as Potters Bar itself (EN6, WD2 and WD23), we survey in Barnet, Enfield and Borehamwood.
Being a smaller town does not change how we work in Potters Bar: free survey, written quote, one team. Whether you are in Potters Bar or elsewhere in Hertfordshire, layout options come with an itemised written quote. For loft rooms and sloping ceilings in Potters Bar homes, the design checks head height where you stand, not just the floor area.
Water across much of Hertfordshire is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
Decisions to make first
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

