- Postcode districts
- ME2
- Nearby
- Rochester, Chatham and Gillingham
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Kent
- Survey
- Free, at your home
What does a new bathroom design cost in Strood?
Design comes with the job: the survey, layout and itemised quote are free. In Strood, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Strood including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Strood
In Strood we cover ME2; we also cover Rochester, 1.3 miles away, and Chatham.
Homes in and around Strood vary, so we look at the floor, the walls and the water system before we price anything. For loft rooms and sloping ceilings in Strood homes, the design checks head height where you stand, not just the floor area. If you are in Strood and weighing a bath against a walk-in shower, the layout options show both with their prices.
Most of Kent has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A conversation about who uses the room, when, and what does not work about the current one
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

