- Postcode districts
- IV30
- Nearby
- Lossiemouth, Forres and Buckie
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of Moray
- Survey
- Free, at your home
What does a new bathroom design cost in Elgin?
Design comes with the job: the survey, layout and itemised quote are free. In Elgin, a complete designed, supplied and fitted bathroom typically costs £6,200–£11,500 including VAT. Labour costs in Scotland put local prices at about 4% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Elgin including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Elgin
We cover every part of Elgin, including IV30, and nearby Lossiemouth (5.1 miles) and Forres (11.5 miles).
Homes in and around Elgin vary, so we look at the floor, the walls and the water system before we price anything. For loft rooms and sloping ceilings in Elgin homes, the design checks head height where you stand, not just the floor area. Whether you are in Elgin or elsewhere in Moray, layout options come with an itemised written quote.
Most of Moray is supplied with soft water. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
Decisions to make first
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in Scotland
In Scotland, a straight refit rarely needs a building warrant, but forming a new bathroom, altering drainage or structural work may. The Technical Handbook uses 15 l/s extract for a bathroom, and the Scottish Water Byelaws 2014 cover new water fittings.

