What does a new bathroom design cost in Great Yarmouth?
Design comes with the job: the survey, layout and itemised quote are free. In Great Yarmouth, a complete designed, supplied and fitted bathroom typically costs £6,900–£12,750 including VAT. We adjust the national guide for East of England, where prices are typically about 6% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Great Yarmouth including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Great Yarmouth
We work right across Great Yarmouth — NR29, NR30 and NR31 — and in neighbouring Norwich and East Dereham.
In Great Yarmouth, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. For loft rooms and sloping ceilings in Great Yarmouth homes, the design checks head height where you stand, not just the floor area. If your Great Yarmouth bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Water across much of Norfolk is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.