- Postcode districts
- TS1, TS2, TS3, TS4, TS5, TS7
- Nearby
- Billingham, Stockton-on-Tees and Thornaby-on-Tees
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Moderately hard across most of North Yorkshire
- Survey
- Free, at your home
What does a new bathroom design cost in Middlesbrough?
Design comes with the job: the survey, layout and itemised quote are free. In Middlesbrough, a complete designed, supplied and fitted bathroom typically costs £6,000–£11,250 including VAT. We adjust the national guide for Yorkshire and the Humber, where prices are typically about 7% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Middlesbrough including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Middlesbrough
We cover every part of Middlesbrough, including TS1, TS2, TS3 and 3 more postcode districts, and nearby Billingham (2.4 miles) and Stockton-on-Tees (3.4 miles).
Middlesbrough has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. If you are in Middlesbrough and weighing a bath against a walk-in shower, the layout options show both with their prices. If your Middlesbrough bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Water across much of North Yorkshire is moderately hard. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

