- Postcode districts
- YO1, YO10, YO24, YO31
- Nearby
- Selby, Kippax and Harrogate
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Moderately hard across most of North Yorkshire
- Survey
- Free, at your home
What does a new bathroom design cost in York?
Design comes with the job: the survey, layout and itemised quote are free. In York, a complete designed, supplied and fitted bathroom typically costs £6,000–£11,250 including VAT. Labour costs in Yorkshire and the Humber put local prices at about 7% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for York including VAT. Your itemised written quote after the free survey is the price that counts.
Working in York
We work right across York — YO1, YO10, YO24 and 1 more postcode districts — and in neighbouring Selby and Kippax.
York is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. A design survey in York covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. We measure York bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan.
Water across much of North Yorkshire is moderately hard. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

