- Postcode districts
- NG15, NG17
- Nearby
- Kirkby in Ashfield, Mansfield and Mansfield Woodhouse
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Nottinghamshire
- Survey
- Free, at your home
What does a new bathroom design cost in Sutton in Ashfield?
Design comes with the job: the survey, layout and itemised quote are free. In Sutton in Ashfield, a complete designed, supplied and fitted bathroom typically costs £6,200–£11,500 including VAT. Prices in East Midlands run at about 4% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Sutton in Ashfield including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Sutton in Ashfield
In Sutton in Ashfield we cover NG15 and NG17; we also cover Kirkby in Ashfield, 1.9 miles away, and Mansfield.
Homes in and around Sutton in Ashfield vary, so we look at the floor, the walls and the water system before we price anything. If your Sutton in Ashfield bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move. If you are in Sutton in Ashfield and weighing a bath against a walk-in shower, the layout options show both with their prices.
Supplies across most of Nottinghamshire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
Decisions to make first
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

