- Postcode districts
- BS22, BS23
- Nearby
- Burnham-on-Sea, Clevedon and Nailsea
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Somerset
- Survey
- Free, at your home
What does a new bathroom design cost in Weston-super-Mare?
Design comes with the job: the survey, layout and itemised quote are free. In Weston-super-Mare, a complete designed, supplied and fitted bathroom typically costs £6,600–£12,250 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Weston-super-Mare including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Weston-super-Mare
We work right across Weston-super-Mare — BS22 and BS23 — and in neighbouring Burnham-on-Sea and Clevedon.
Across a large town like Weston-super-Mare, homes range from older terraces to newer estates; the survey tells us which pipework and floor we are dealing with. A design survey in Weston-super-Mare covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. For loft rooms and sloping ceilings in Weston-super-Mare homes, the design checks head height where you stand, not just the floor area.
Water across much of Somerset is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

