- Postcode districts
- GU15, GU16
- Nearby
- Sandhurst, Farnborough and Crowthorne
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Surrey
- Survey
- Free, at your home
What does a new bathroom design cost in Camberley?
Design comes with the job: the survey, layout and itemised quote are free. In Camberley, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Camberley including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Camberley
We work right across Camberley — GU15 and GU16 — and in neighbouring Sandhurst and Farnborough.
Homes in and around Camberley vary, so we look at the floor, the walls and the water system before we price anything. We measure Camberley bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan. Whether you are in Camberley or elsewhere in Surrey, layout options come with an itemised written quote.
Supplies across most of Surrey are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
Decisions to make first
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

