- Postcode districts
- GU21, GU22
- Nearby
- Chertsey, Weybridge and Guildford
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Surrey
- Survey
- Free, at your home
What does a new bathroom design cost in Woking?
Design comes with the job: the survey, layout and itemised quote are free. In Woking, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Woking including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Woking
In Woking we cover GU21 and GU22; we also cover Chertsey, 5.3 miles away, and Weybridge.
Woking has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. If your Woking bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move. Whether you are in Woking or elsewhere in Surrey, layout options come with an itemised written quote.
Most of Surrey has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- A conversation about who uses the room, when, and what does not work about the current one
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

