- Postcode districts
- RH10, RH11
- Nearby
- Horley, Horsham and East Grinstead
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of West Sussex
- Survey
- Free, at your home
What does a new bathroom design cost in Crawley?
Design comes with the job: the survey, layout and itemised quote are free. In Crawley, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Crawley including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Crawley
In Crawley we cover RH10 and RH11; we also cover Horley, 4.4 miles away, and Horsham.
Across a large town like Crawley, homes range from older terraces to newer estates; the survey tells us which pipework and floor we are dealing with. For loft rooms and sloping ceilings in Crawley homes, the design checks head height where you stand, not just the floor area. If you are in Crawley and weighing a bath against a walk-in shower, the layout options show both with their prices.
Most of West Sussex has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A conversation about who uses the room, when, and what does not work about the current one
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
Decisions to make first
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Storage
Fitted furniture, a vanity with a tall cupboard, or recessed niches and a mirror cabinet. Recessed storage costs no floor space but needs a stud wall or deep boxing to sit in.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

