- Postcode districts
- LS10, LS26, WF3
- Nearby
- Wakefield, Morley and Ossett
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of West Yorkshire
- Survey
- Free, at your home
What does a new bathroom design cost in Lofthouse?
Design comes with the job: the survey, layout and itemised quote are free. In Lofthouse, a complete designed, supplied and fitted bathroom typically costs £6,000–£11,250 including VAT. Labour costs in Yorkshire and the Humber put local prices at about 7% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Lofthouse including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Lofthouse
In Lofthouse we cover LS10, LS26 and WF3; we also cover Wakefield, 3.2 miles away, and Morley.
Lofthouse gets the same process as anywhere else: a free survey at your home and a written, itemised quote. For loft rooms and sloping ceilings in Lofthouse homes, the design checks head height where you stand, not just the floor area. If you are in Lofthouse and weighing a bath against a walk-in shower, the layout options show both with their prices.
Water across much of West Yorkshire is soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- A conversation about who uses the room, when, and what does not work about the current one
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

