- Postcode districts
- DY10, DY11
- Nearby
- Stourport-on-Severn, Stourbridge and Kingswinford
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Moderately hard across most of Worcestershire
- Survey
- Free, at your home
What does a new bathroom design cost in Kidderminster?
Design comes with the job: the survey, layout and itemised quote are free. In Kidderminster, a complete designed, supplied and fitted bathroom typically costs £6,400–£11,750 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Kidderminster including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Kidderminster
In Kidderminster we cover DY10 and DY11; we also cover Stourport-on-Severn, 3.6 miles away, and Stourbridge.
Homes in and around Kidderminster vary, so we look at the floor, the walls and the water system before we price anything. Whether you are in Kidderminster or elsewhere in Worcestershire, layout options come with an itemised written quote. We measure Kidderminster bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan.
Supplies across most of Worcestershire are moderately hard. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

