What does bathroom fitting cost in Manchester?
In Manchester, bathroom fitting typically costs £2,100–£5,600 including VAT, based on North West England prices. We adjust the national guide for North West England, where prices are typically about 6% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit only, same layout
- You supply the suite and tiles
Fit only, new layout
- Boarding and tiling labour
Supply and fit
- See complete fitted bathrooms
Guide prices for Manchester including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Manchester
We work right across Manchester — M1, M2, M4 and 16 more postcode districts — and in neighbouring Salford and Old Trafford.
Manchester is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. We survey in Manchester before quoting fit-only work, so the soil stack, supplies and walls are checked against the products you have chosen. For Manchester bathrooms keeping the same layout, fit-only is the cheaper route, because the pipework stays largely where it is.
Water across much of Greater Manchester is soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Fitting the suite, furniture, screen and accessories, then silicone, testing and a clean handover
- A check of your product list against the room and the plumbing before the job is booked
- First and second-fix plumbing: supplies, wastes, isolation valves and the connection to the soil stack
- Strip-out of the old suite and tiles, and removal of the waste
Decisions to make first
Tiling
Some customers tile themselves or use a separate tiler. That can work, but the order of trades and who tanks the shower area must be agreed first.
Delivery timing
Having everything delivered and checked before the start date avoids a half-finished room while a missing part is sent again.
Rules that apply in England
In England, the Water Supply (Water Fittings) Regulations 1999 apply to the products you supply as well as to the installation. Electrical changes such as new lights or a fan are notifiable under Part P and are done by a registered electrician or notified to building control. New drainage or a new connection to the soil stack can be Part H work.