- Postcode districts
- KT7, KT10
- Nearby
- East Molesey, West Molesey and Walton-on-Thames
- Guide price
- £2,500–£6,700
- Typical time on site
- 4–8 working days
- Water
- Hard across most of Surrey
- Survey
- Free, at your home
What does bathroom fitting cost in Esher?
As a guide, budget £2,500 to £6,700 including VAT for bathroom fitting in Esher; your written quote will pin it down. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit only, same layout
- Tiling labour
Fit only, new layout
- Pipework and waste re-routed
Supply and fit
- One price for everything
Guide prices for Esher including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Esher
In Esher we cover KT7 and KT10; we also cover East Molesey, 2.1 miles away, and West Molesey.
Homes in and around Esher vary, so we look at the floor, the walls and the water system before we price anything. Landlords with flats or houses in Esher can supply their own standard suites and have them fitted between tenancies. If your Esher home runs on a combi boiler or an unvented cylinder, we check your chosen shower valve suits it before fitting.
Water across much of Surrey is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A survey of the room, the supplies and drainage, and the products you plan to use
- Unpacking and checking delivered items before day one, so damage or missing parts can go back to the seller early
- Electrical work by a qualified electrician where lights, a fan or a shaver socket are changing
- First and second-fix plumbing: supplies, wastes, isolation valves and the connection to the soil stack
Decisions to make first
Making good
Decide whether you want the quote to cover making good and decorating, or to stop at the tiles so you can paint yourself.
Delivery timing
Having everything delivered and checked before the start date avoids a half-finished room while a missing part is sent again.
Rules that apply in England
In England, the Water Supply (Water Fittings) Regulations 1999 apply to the products you supply as well as to the installation. Electrical changes such as new lights or a fan are notifiable under Part P and are done by a registered electrician or notified to building control. New drainage or a new connection to the soil stack can be Part H work.

