- Postcode districts
- AB10, AB11, AB12, AB15, AB16, AB23 + 2 more
- Nearby
- Inverurie, Peterhead and Fraserburgh
- Guide price
- £7,200–£14,500
- Typical time on site
- 8–15 working days
- Water
- Soft across most of Aberdeen and Aberdeenshire
- Survey
- Free, at your home
What does a bathroom renovation cost in Aberdeen?
In Aberdeen, a bathroom renovation typically costs £7,200–£14,500 including VAT, based on Scotland prices. Prices in Scotland run at about 4% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Same layout, new suite
Full renovation
- Re-plaster, new pipework and electrics
Structural
- Ventilation and lighting redesigned
Guide prices for Aberdeen including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Aberdeen
We work right across Aberdeen — AB10, AB11, AB12 and 5 more postcode districts — and in neighbouring Inverurie and Peterhead.
Aberdeen is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. In Aberdeen flats, the title deeds and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent. Whether your Aberdeen bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic.
Supplies across most of Aberdeen and Aberdeenshire are soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- New hot and cold pipework and wastes, with isolation valves to each fitting
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
Decisions to make first
Plaster or boards
Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.
Heating
Moving the radiator, adding a heated towel rail or laying underfloor heating is simpler while the room is stripped.
Rules that apply in Scotland
In Scotland, structural work, altering drainage or forming a new bathroom may need a building warrant, which must be granted before that work starts. A straight refit rarely needs one. Electrical work is tested and certified to BS 7671.

