- Postcode districts
- PA34
- Nearby
- Dunoon and Helensburgh
- Guide price
- £7,200–£14,500
- Typical time on site
- 8–15 working days
- Water
- Soft across most of Argyll and Bute
- Survey
- Free, dates by arrangement
What does a bathroom renovation cost in Oban?
In Oban, a bathroom renovation typically costs £7,200–£14,500 including VAT, based on Scotland prices. We adjust the national guide for Scotland, where prices are typically about 4% below the UK average. Travel and delivery to islands and remote areas are priced on your quote. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Make good and decorate
Full renovation
- Back to brick or studwork
Structural
- New drainage route
Guide prices for Oban including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Oban
We cover all of Oban, including PA34, and nearby Dunoon and Helensburgh. Because Oban is further afield, we arrange survey visits in batches; tell us your timescale and we will confirm a date before you commit to anything.
Being a smaller town does not change how we work in Oban: free survey, written quote, one team. Whether your Oban bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic. For listed and period properties in Oban, we check early whether listed building consent applies to the work you have in mind.
Most of Argyll and Bute is supplied with soft water. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
Decisions to make first
Shower floor
With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.
Combining rooms
Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.
Rules that apply in Scotland
In Scotland, structural work, altering drainage or forming a new bathroom may need a building warrant, which must be granted before that work starts. A straight refit rarely needs one. Electrical work is tested and certified to BS 7671.

