- Postcode districts
- KA11, KA12
- Nearby
- Kilwinning, Kilmarnock and Ayr
- Guide price
- £7,200–£14,500
- Typical time on site
- 8–15 working days
- Water
- Soft across most of Ayrshire
- Survey
- Free, at your home
What does a bathroom renovation cost in Irvine?
Guide price in Irvine: £7,200–£14,500 including VAT, depending on the room and what you choose. Labour costs in Scotland put local prices at about 4% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Make good and decorate
Full renovation
- Back to brick or studwork
Structural
- New drainage route
Guide prices for Irvine including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Irvine
We work right across Irvine — KA11 and KA12 — and in neighbouring Kilwinning and Kilmarnock.
Homes in and around Irvine vary, so we look at the floor, the walls and the water system before we price anything. For listed and period properties in Irvine, we check early whether listed building consent applies to the work you have in mind. If your Irvine home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense.
Most of Ayrshire is supplied with soft water. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
- Repairs to rotten floorboards, joists or other timber found once the room is open
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
Decisions to make first
Heating
Moving the radiator, adding a heated towel rail or laying underfloor heating is simpler while the room is stripped.
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Rules that apply in Scotland
In Scotland, structural work, altering drainage or forming a new bathroom may need a building warrant, which must be granted before that work starts. A straight refit rarely needs one. Electrical work is tested and certified to BS 7671.

