Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Berkshire · SL4

Bathroom renovation in Windsor

We cover bathroom renovation in Windsor and the rest of Berkshire. Every job starts with a measured survey at your home and a written price before anything is ordered.

£8,400–£16,750 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Windsor
Postcode districts
SL4
Nearby
Slough, Egham and Staines
Guide price
£8,400–£16,750
Typical time on site
8–15 working days
Water
Hard across most of Berkshire
Survey
Free, at your home

What does a bathroom renovation cost in Windsor?

For Windsor, our guide range for a bathroom renovation is £8,400 to £16,750 including VAT. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£5,600–£9,000
  • Re-tile and re-floor

Structural

£13,500–£24,750
  • Walls moved or rooms combined

Guide prices for Windsor including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Windsor

We work right across Windsor — SL4 — and in neighbouring Slough and Egham.

Homes in and around Windsor vary, so we look at the floor, the walls and the water system before we price anything. For listed and period properties in Windsor, we check early whether listed building consent applies to the work you have in mind. If you have just bought a house in Windsor, renovating the bathroom before moving in saves living through the dust.

Water across much of Berkshire is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
  • Re-plastering or boarding, with cement-based boards and tanking in the wet areas
  • A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
  • Repairs to rotten floorboards, joists or other timber found once the room is open

Decisions to make first

Pipe material

Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.

Combining rooms

Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in Windsor: questions

What is the price of a bathroom renovation in Windsor?

A bathroom renovation in Windsor usually costs £8,400–£16,750 including VAT. Expect the lower end for a like-for-like job with standard products, and the upper end if things move or you choose premium finishes. Your quote is itemised and fixed in writing once agreed.

Is the water hard in Windsor?

Water across much of Berkshire is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Who handles building control for a bathroom renovation in Windsor?

Building control for Windsor is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

How long does a bathroom renovation take?

Allow 8–15 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Windsor.

Do I need building regulations approval for a bathroom renovation?

Often, for parts of the job. New electrical circuits, new drainage or connections to the soil stack, and structural changes such as removing a wall can all be building regulations work. Replacing a suite in the same positions usually is not. We tell you which items apply to your job and who will notify them.

Bathroom renovation in Windsor

Book a free home survey in Windsor. You get a measured layout and an itemised written price before anything is ordered.