- Postcode districts
- MK6, MK9, MK10, MK14
- Nearby
- Leighton Buzzard, Ampthill and Kempston
- Guide price
- £8,400–£16,750
- Typical time on site
- 8–15 working days
- Water
- Hard across most of Buckinghamshire
- Survey
- Free, at your home
What does a bathroom renovation cost in Milton Keynes?
Guide price in Milton Keynes: £8,400–£16,750 including VAT, depending on the room and what you choose. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Re-tile and re-floor
Full renovation
- New layout options
Structural
- Walls moved or rooms combined
Guide prices for Milton Keynes including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Milton Keynes
As well as Milton Keynes itself (MK6, MK9, MK10 and 1 more postcode districts), we survey in Leighton Buzzard, Ampthill and Kempston.
Milton Keynes is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. If you have just bought a house in Milton Keynes, renovating the bathroom before moving in saves living through the dust. If your Milton Keynes home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense.
Supplies across most of Buckinghamshire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
- New hot and cold pipework and wastes, with isolation valves to each fitting
Decisions to make first
Combining rooms
Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.
Plaster or boards
Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

