Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Cambridgeshire · CB6

Bathroom renovation in Ely

Looking for a bathroom renovation in Ely? We design, supply and fit bathrooms across Cambridgeshire, starting with a free home survey and an itemised written quote.

£8,000–£16,000 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Ely
Postcode districts
CB6, CB7
Nearby
Newmarket, March and St Ives
Guide price
£8,000–£16,000
Typical time on site
8–15 working days
Water
Very hard across most of Cambridgeshire
Survey
Free, at your home

What does a bathroom renovation cost in Ely?

Guide price in Ely: £8,000–£16,000 including VAT, depending on the room and what you choose. We adjust the national guide for East of England, where prices are typically about 6% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£5,300–£8,500
  • Make good and decorate

Structural

£12,750–£23,250
  • New drainage route

Guide prices for Ely including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Ely

We cover every part of Ely, including CB6 and CB7, and nearby Newmarket (12.3 miles) and March (12.8 miles).

Being a smaller town does not change how we work in Ely: free survey, written quote, one team. A renovation survey in Ely looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper. In Ely flats, the lease and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent.

Water across much of Cambridgeshire is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Re-plastering or boarding, with cement-based boards and tanking in the wet areas
  • Tiling, fitting of the suite and furniture, making good and decorating, then handover
  • New hot and cold pipework and wastes, with isolation valves to each fitting
  • Repairs to rotten floorboards, joists or other timber found once the room is open

Decisions to make first

Pipe material

Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.

How far back to strip

Back to brick gives a clean start. Keeping sound plaster on some walls saves time and money, and the survey shows which walls can stay.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in Ely: questions

How much should I budget for a bathroom renovation in Ely?

A bathroom renovation in Ely usually costs £8,000–£16,000 including VAT. Expect the lower end for a like-for-like job with standard products, and the upper end if things move or you choose premium finishes. Your quote is itemised and fixed in writing once agreed.

How long does a bathroom renovation take?

Allow 8–15 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Ely.

Is the home survey in Ely really free?

Yes. We visit, measure the room, check the pipework, drainage and electrics, and talk through what you want. You then get a written, itemised quote with no obligation to go ahead.

Do you cover CB6 and CB7 in Ely?

Yes. We cover all of Ely, including CB6 and CB7, and nearby Newmarket, March and St Ives. Survey visits are free and arranged at a time that suits you.

What is the difference between a bathroom refit and a renovation?

A refit replaces the visible parts, the suite, tiles and floor, and keeps the pipework, wiring and walls behind them. A renovation strips the room to its structure and replaces those hidden services too, often with a new layout. It costs more and takes longer, but it deals with problems a refit would only cover up.

Bathroom renovation in Ely

Book a free home survey in Ely. You get a measured layout and an itemised written price before anything is ordered.