- Postcode districts
- BT19, BT20
- Nearby
- Newtownards, Carrickfergus and Newtownabbey
- Guide price
- £6,600–£13,250
- Typical time on site
- 8–15 working days
- Water
- Soft across most of County Down
- Survey
- Free, at your home
What does a bathroom renovation cost in Bangor?
In Bangor, a bathroom renovation typically costs £6,600–£13,250 including VAT, based on Northern Ireland prices. Prices in Northern Ireland run at about 12% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Make good and decorate
Full renovation
- Back to brick or studwork
Structural
- New drainage route
Guide prices for Bangor including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Bangor
We work right across Bangor — BT19 and BT20 — and in neighbouring Newtownards and Carrickfergus.
In a city the size of Bangor, parking and access for a skip are worth sorting before the start date — we will ask at the survey. If your Bangor home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense. If you have just bought a house in Bangor, renovating the bathroom before moving in saves living through the dust.
Water across much of County Down is soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
Decisions to make first
Shower floor
With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Rules that apply in Northern Ireland
In Northern Ireland, building control covers drainage, structural changes and ventilation, with ventilation set out in Technical Booklet K. There is no Part P, but new wiring should be designed, tested and certified to BS 7671.

