- Postcode districts
- EX16
- Nearby
- Exeter, Taunton and Exmouth
- Guide price
- £7,600–£15,250
- Typical time on site
- 8–15 working days
- Water
- Soft across most of Devon
- Survey
- Free, at your home
What does a bathroom renovation cost in Tiverton?
Our guide price for a bathroom renovation in Tiverton is £7,600–£15,250 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Make good and decorate
Full renovation
- Back to brick or studwork
Structural
- New drainage route
Guide prices for Tiverton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Tiverton
In Tiverton we cover EX16; we also cover Exeter, 12.4 miles away, and Taunton.
Tiverton gets the same process as anywhere else: a free survey at your home and a written, itemised quote. A renovation survey in Tiverton looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper. In Tiverton flats, the lease and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent.
Water across much of Devon is soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
Decisions to make first
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Combining rooms
Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

