- Postcode districts
- HU1, HU2, HU3
- Nearby
- Beverley, Brough and Grimsby
- Guide price
- £7,000–£14,000
- Typical time on site
- 8–15 working days
- Water
- Hard across most of the East Riding of Yorkshire
- Survey
- Free, at your home
What does a bathroom renovation cost in Kingston upon Hull?
For Kingston upon Hull, our guide range for a bathroom renovation is £7,000 to £14,000 including VAT. Labour costs in Yorkshire and the Humber put local prices at about 7% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Same layout, new suite
Full renovation
- Re-plaster, new pipework and electrics
Structural
- Ventilation and lighting redesigned
Guide prices for Kingston upon Hull including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Kingston upon Hull
In Kingston upon Hull we cover HU1, HU2 and HU3; we also cover Beverley, 7.9 miles away, and Brough.
Kingston upon Hull is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. In Kingston upon Hull flats, the lease and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent. For listed and period properties in Kingston upon Hull, we check early whether listed building consent applies to the work you have in mind.
Supplies across most of the East Riding of Yorkshire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
- Repairs to rotten floorboards, joists or other timber found once the room is open
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
Decisions to make first
Plaster or boards
Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.
Shower floor
With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

