Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Gloucestershire · GL5

Bathroom renovation in Stroud

Bathroom renovation in Stroud, planned from measurements taken in your home and priced in writing. We cover GL5, GL6 and GL10 and the surrounding area.

£7,600–£15,250 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Stroud
Postcode districts
GL5, GL6, GL10
Nearby
Gloucester, Cirencester and Cheltenham
Guide price
£7,600–£15,250
Typical time on site
8–15 working days
Water
Hard across most of Gloucestershire
Survey
Free, at your home

What does a bathroom renovation cost in Stroud?

Our guide price for a bathroom renovation in Stroud is £7,600–£15,250 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£5,100–£8,200
  • Re-tile and re-floor

Structural

£12,250–£22,500
  • Walls moved or rooms combined

Guide prices for Stroud including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Stroud

We cover every part of Stroud, including GL5, GL6 and GL10, and nearby Gloucester (8.2 miles) and Cirencester (10 miles).

Homes in and around Stroud vary, so we look at the floor, the walls and the water system before we price anything. A renovation survey in Stroud looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper. If your Stroud home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense.

Supplies across most of Gloucestershire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
  • Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
  • New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
  • A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation

Decisions to make first

Plaster or boards

Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.

How far back to strip

Back to brick gives a clean start. Keeping sound plaster on some walls saves time and money, and the survey shows which walls can stay.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in Stroud: questions

How much does a bathroom renovation cost in Stroud?

A bathroom renovation in Stroud usually costs £7,600–£15,250 including VAT. Room size, layout changes and your choice of products move the figure within that range. The free survey gives you an itemised quote, fixed in writing once the details are agreed.

Is the water hard in Stroud?

Supplies across most of Gloucestershire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Who handles building control for a bathroom renovation in Stroud?

Building control for Stroud is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

How long does a bathroom renovation take?

Allow 8–15 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Stroud.

Can I live in the house during a bathroom renovation?

Yes, most people do. Expect dust, noise and the water to be off for short spells, and plan for no bath or shower in that room for two to three weeks. If it is your only toilet, talk to us at the survey about keeping a WC working for as much of the job as possible.

Bathroom renovation in Stroud

Book a free home survey in Stroud. You get a measured layout and an itemised written price before anything is ordered.