Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Greater London · DA5

Bathroom renovation in Bexley

We handle bathroom renovation for homeowners and landlords in Bexley, with the survey, products, strip-out, trades and fitting under one contract.

£9,400–£18,750 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Bexley
Postcode districts
DA5, DA6, DA14, DA15, DA16
Nearby
Dartford, Swanley and Barking
Guide price
£9,400–£18,750
Typical time on site
8–15 working days
Water
Very hard across most of Greater London
Survey
Free, at your home

What does a bathroom renovation cost in Bexley?

In Bexley, a bathroom renovation typically costs £9,400–£18,750 including VAT, based on London prices. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£6,200–£10,000
  • Make good and decorate

Structural

£15,000–£27,500
  • New drainage route

Guide prices for Bexley including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Bexley

We work right across Bexley — DA5, DA6, DA14 and 2 more postcode districts — and in neighbouring Dartford and Swanley.

London homes in Bexley often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. Whether your Bexley bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic. If your Bexley home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense.

Supplies across most of Greater London are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
  • Repairs to rotten floorboards, joists or other timber found once the room is open
  • New hot and cold pipework and wastes, with isolation valves to each fitting
  • Re-plastering or boarding, with cement-based boards and tanking in the wet areas

Decisions to make first

Combining rooms

Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.

Plaster or boards

Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in Bexley: questions

How much does a bathroom renovation cost in Bexley?

A bathroom renovation in Bexley usually costs £9,400–£18,750 including VAT. Expect the lower end for a like-for-like job with standard products, and the upper end if things move or you choose premium finishes. Your quote is itemised and fixed in writing once agreed.

Is the water hard in Bexley?

Supplies across most of Greater London are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Who handles building control for a bathroom renovation in Bexley?

Building control for Bexley is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

How long does a bathroom renovation take?

Allow 8–15 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Bexley.

Can I live in the house during a bathroom renovation?

Yes, most people do. Expect dust, noise and the water to be off for short spells, and plan for no bath or shower in that room for two to three weeks. If it is your only toilet, talk to us at the survey about keeping a WC working for as much of the job as possible.

Bathroom renovation in Bexley

Book a free home survey in Bexley. You get a measured layout and an itemised written price before anything is ordered.