- Postcode districts
- TW4, TW13, TW14
- Nearby
- Ashford, Hounslow and Sunbury-on-Thames
- Guide price
- £9,400–£18,750
- Typical time on site
- 8–15 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a bathroom renovation cost in Feltham?
Guide price in Feltham: £9,400–£18,750 including VAT, depending on the room and what you choose. Labour costs in London put local prices at about 25% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Re-tile and re-floor
Full renovation
- New layout options
Structural
- Walls moved or rooms combined
Guide prices for Feltham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Feltham
As well as Feltham itself (TW4, TW13 and TW14), we survey in Ashford, Hounslow and Sunbury-on-Thames.
In Feltham, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If your Feltham home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense. If you have just bought a house in Feltham, renovating the bathroom before moving in saves living through the dust.
Most of Greater London has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
- New hot and cold pipework and wastes, with isolation valves to each fitting
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- Repairs to rotten floorboards, joists or other timber found once the room is open
Decisions to make first
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Heating
Moving the radiator, adding a heated towel rail or laying underfloor heating is simpler while the room is stripped.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

