- Postcode districts
- PO11
- Nearby
- South Hayling, Emsworth and Havant
- Guide price
- £8,400–£16,750
- Typical time on site
- 8–15 working days
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does a bathroom renovation cost in Hayling Island?
Our guide price for a bathroom renovation in Hayling Island is £8,400–£16,750 including VAT. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Same layout, new suite
Full renovation
- Re-plaster, new pipework and electrics
Structural
- Ventilation and lighting redesigned
Guide prices for Hayling Island including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Hayling Island
We cover every part of Hayling Island, including PO11, and nearby South Hayling (0.5 miles) and Emsworth (4.6 miles).
Being a smaller town does not change how we work in Hayling Island: free survey, written quote, one team. A renovation survey in Hayling Island looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper. For listed and period properties in Hayling Island, we check early whether listed building consent applies to the work you have in mind.
Supplies across most of Hampshire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
Decisions to make first
Plaster or boards
Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.
Shower floor
With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

