- Postcode districts
- SG13, SG14
- Nearby
- Ware, Hoddesdon and Welwyn Garden City
- Guide price
- £8,000–£16,000
- Typical time on site
- 8–15 working days
- Water
- Very hard across most of Hertfordshire
- Survey
- Free, at your home
What does a bathroom renovation cost in Hertford?
For Hertford, our guide range for a bathroom renovation is £8,000 to £16,000 including VAT. Prices in East of England run at about 6% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Make good and decorate
Full renovation
- Back to brick or studwork
Structural
- New drainage route
Guide prices for Hertford including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Hertford
We cover every part of Hertford, including SG13 and SG14, and nearby Ware (2.4 miles) and Hoddesdon (3.7 miles).
Homes in and around Hertford vary, so we look at the floor, the walls and the water system before we price anything. For listed and period properties in Hertford, we check early whether listed building consent applies to the work you have in mind. In Hertford flats, the lease and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent.
Water across much of Hertfordshire is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
Decisions to make first
Plaster or boards
Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

