- Postcode districts
- IV1, IV3
- Nearby
- Nairn and Fort William
- Guide price
- £7,200–£14,500
- Typical time on site
- 8–15 working days
- Water
- Soft across most of the Highlands and Islands
- Survey
- Free, at your home
What does a bathroom renovation cost in Inverness?
For Inverness, our guide range for a bathroom renovation is £7,200 to £14,500 including VAT. We adjust the national guide for Scotland, where prices are typically about 4% below the UK average. Travel and delivery to islands and remote areas are priced on your quote. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Same layout, new suite
Full renovation
- Re-plaster, new pipework and electrics
Structural
- Ventilation and lighting redesigned
Guide prices for Inverness including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Inverness
We cover all of Inverness, including IV1 and IV3, and nearby Nairn and Fort William.
Inverness is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. If you have just bought a house in Inverness, renovating the bathroom before moving in saves living through the dust. In Inverness flats, the title deeds and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent.
Most of the Highlands and Islands is supplied with soft water. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- New hot and cold pipework and wastes, with isolation valves to each fitting
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
Decisions to make first
Shower floor
With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Rules that apply in Scotland
In Scotland, structural work, altering drainage or forming a new bathroom may need a building warrant, which must be granted before that work starts. A straight refit rarely needs one. Electrical work is tested and certified to BS 7671.

