Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Kent · CT1

Bathroom renovation in Canterbury

Looking for a bathroom renovation in Canterbury? We design, supply and fit bathrooms across Kent, starting with a free home survey and an itemised written quote.

£8,400–£16,750 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Canterbury
Postcode districts
CT1, CT2, CT5, CT6
Nearby
Whitstable, Herne Bay and Faversham
Guide price
£8,400–£16,750
Typical time on site
8–15 working days
Water
Very hard across most of Kent
Survey
Free, at your home

What does a bathroom renovation cost in Canterbury?

Our guide price for a bathroom renovation in Canterbury is £8,400–£16,750 including VAT. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£5,600–£9,000
  • Same layout, new suite

Structural

£13,500–£24,750
  • Ventilation and lighting redesigned

Guide prices for Canterbury including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Canterbury

We work right across Canterbury — CT1, CT2, CT5 and 1 more postcode districts — and in neighbouring Whitstable and Herne Bay.

Canterbury is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. Whether your Canterbury bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic. A renovation survey in Canterbury looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper.

Supplies across most of Kent are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Repairs to rotten floorboards, joists or other timber found once the room is open
  • Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
  • Re-plastering or boarding, with cement-based boards and tanking in the wet areas
  • Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier

Decisions to make first

How far back to strip

Back to brick gives a clean start. Keeping sound plaster on some walls saves time and money, and the survey shows which walls can stay.

Shower floor

With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in Canterbury: questions

How much should I budget for a bathroom renovation in Canterbury?

A bathroom renovation in Canterbury usually costs £8,400–£16,750 including VAT. Room size, layout changes and your choice of products move the figure within that range. The free survey gives you an itemised quote, fixed in writing once the details are agreed.

Is the water hard in Canterbury?

Supplies across most of Kent are very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Who handles building control for a bathroom renovation in Canterbury?

Building control for Canterbury is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

How long does a bathroom renovation take?

Allow 8–15 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Canterbury.

Do I need building regulations approval for a bathroom renovation?

Often, for parts of the job. New electrical circuits, new drainage or connections to the soil stack, and structural changes such as removing a wall can all be building regulations work. Replacing a suite in the same positions usually is not. We tell you which items apply to your job and who will notify them.

Bathroom renovation in Canterbury

Book a free home survey in Canterbury. You get a measured layout and an itemised written price before anything is ordered.