- Postcode districts
- ML3
- Nearby
- Motherwell, Blantyre and Larkhall
- Guide price
- £7,200–£14,500
- Typical time on site
- 8–15 working days
- Water
- Soft across most of Lanarkshire
- Survey
- Free, at your home
What does a bathroom renovation cost in Hamilton?
Guide price in Hamilton: £7,200–£14,500 including VAT, depending on the room and what you choose. Labour costs in Scotland put local prices at about 4% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Re-tile and re-floor
Full renovation
- New layout options
Structural
- Walls moved or rooms combined
Guide prices for Hamilton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Hamilton
In Hamilton we cover ML3; we also cover Motherwell, 2.2 miles away, and Blantyre.
Homes in and around Hamilton vary, so we look at the floor, the walls and the water system before we price anything. In Hamilton flats, the title deeds and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent. Whether your Hamilton bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic.
Supplies across most of Lanarkshire are soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- New hot and cold pipework and wastes, with isolation valves to each fitting
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
Decisions to make first
Shower floor
With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.
Plaster or boards
Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.
Rules that apply in Scotland
In Scotland, structural work, altering drainage or forming a new bathroom may need a building warrant, which must be granted before that work starts. A straight refit rarely needs one. Electrical work is tested and certified to BS 7671.

