Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Shropshire · TF1

Bathroom renovation in Wellington

We handle bathroom renovation for homeowners and landlords in Wellington, with the survey, products, strip-out, trades and fitting under one contract.

£7,400–£14,750 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Wellington
Postcode districts
TF1, TF5
Nearby
Telford, Shrewsbury and Stafford
Guide price
£7,400–£14,750
Typical time on site
8–15 working days
Water
Moderately hard across most of Shropshire
Survey
Free, at your home

What does a bathroom renovation cost in Wellington?

As a guide, budget £7,400 to £14,750 including VAT for a bathroom renovation in Wellington; your written quote will pin it down. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£4,900–£7,800
  • Make good and decorate

Structural

£11,750–£21,500
  • New drainage route

Guide prices for Wellington including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Wellington

As well as Wellington itself (TF1 and TF5), we survey in Telford, Shrewsbury and Stafford.

Being a smaller town does not change how we work in Wellington: free survey, written quote, one team. If you have just bought a house in Wellington, renovating the bathroom before moving in saves living through the dust. If your Wellington home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense.

Supplies across most of Shropshire are moderately hard. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Repairs to rotten floorboards, joists or other timber found once the room is open
  • Tiling, fitting of the suite and furniture, making good and decorating, then handover
  • A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
  • New hot and cold pipework and wastes, with isolation valves to each fitting

Decisions to make first

Heating

Moving the radiator, adding a heated towel rail or laying underfloor heating is simpler while the room is stripped.

Shower floor

With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in Wellington: questions

How much should I budget for a bathroom renovation in Wellington?

A bathroom renovation in Wellington usually costs £7,400–£14,750 including VAT. Where you land in that range depends on the size of the room, whether the layout changes and the products you choose. After the free survey you get an itemised written quote, and the price is fixed in writing once the layout and products are agreed.

Is the water hard in Wellington?

Supplies across most of Shropshire are moderately hard. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Who handles building control for a bathroom renovation in Wellington?

Building control for Wellington is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

How long does a bathroom renovation take?

Allow 8–15 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Wellington.

Can I live in the house during a bathroom renovation?

Yes, most people do. Expect dust, noise and the water to be off for short spells, and plan for no bath or shower in that room for two to three weeks. If it is your only toilet, talk to us at the survey about keeping a WC working for as much of the job as possible.

Bathroom renovation in Wellington

Book a free home survey in Wellington. You get a measured layout and an itemised written price before anything is ordered.