- Postcode districts
- KT7, KT8, TW12
- Nearby
- West Molesey, Esher and Surbiton
- Guide price
- £8,400–£16,750
- Typical time on site
- 8–15 working days
- Water
- Hard across most of Surrey
- Survey
- Free, at your home
What does a bathroom renovation cost in East Molesey?
Guide price in East Molesey: £8,400–£16,750 including VAT, depending on the room and what you choose. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Same layout, new suite
Full renovation
- Re-plaster, new pipework and electrics
Structural
- Ventilation and lighting redesigned
Guide prices for East Molesey including VAT. Your itemised written quote after the free survey is the price that counts.
Working in East Molesey
As well as East Molesey itself (KT7, KT8 and TW12), we survey in West Molesey, Esher and Surbiton.
Being a smaller town does not change how we work in East Molesey: free survey, written quote, one team. In East Molesey flats, the lease and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent. If you have just bought a house in East Molesey, renovating the bathroom before moving in saves living through the dust.
Water across much of Surrey is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- New hot and cold pipework and wastes, with isolation valves to each fitting
- Repairs to rotten floorboards, joists or other timber found once the room is open
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
Decisions to make first
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Heating
Moving the radiator, adding a heated towel rail or laying underfloor heating is simpler while the room is stripped.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

