Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Surrey · RH6

Bathroom renovation in Horley

We cover bathroom renovation in Horley and the rest of Surrey. Every job starts with a measured survey at your home and a written price before anything is ordered.

£8,400–£16,750 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Horley
Postcode districts
RH6
Nearby
Crawley, Redhill and Reigate
Guide price
£8,400–£16,750
Typical time on site
8–15 working days
Water
Hard across most of Surrey
Survey
Free, at your home

What does a bathroom renovation cost in Horley?

In Horley, a bathroom renovation typically costs £8,400–£16,750 including VAT, based on South East England prices. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£5,600–£9,000
  • Make good and decorate

Structural

£13,500–£24,750
  • New drainage route

Guide prices for Horley including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Horley

As well as Horley itself (RH6), we survey in Crawley, Redhill and Reigate.

Being a smaller town does not change how we work in Horley: free survey, written quote, one team. If your Horley home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense. Whether your Horley bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic.

Supplies across most of Surrey are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
  • Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
  • New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
  • Tiling, fitting of the suite and furniture, making good and decorating, then handover

Decisions to make first

Combining rooms

Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.

How far back to strip

Back to brick gives a clean start. Keeping sound plaster on some walls saves time and money, and the survey shows which walls can stay.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in Horley: questions

How much should I budget for a bathroom renovation in Horley?

A bathroom renovation in Horley usually costs £8,400–£16,750 including VAT. Where you land in that range depends on the size of the room, whether the layout changes and the products you choose. After the free survey you get an itemised written quote, and the price is fixed in writing once the layout and products are agreed.

Is the water hard in Horley?

Supplies across most of Surrey are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Who handles building control for a bathroom renovation in Horley?

Building control for Horley is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

How long does a bathroom renovation take?

Allow 8–15 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Horley.

Should I renovate the bathroom before or after other building work?

If you are also rewiring, replacing the boiler or replumbing the house, do the bathroom at the same time as those works or straight after their first fix. New pipes and cables are then run once, and fresh tiles are not disturbed later.

Bathroom renovation in Horley

Book a free home survey in Horley. You get a measured layout and an itemised written price before anything is ordered.