- Postcode districts
- BN2, BN10
- Nearby
- Peacehaven, Brighton and Hove
- Guide price
- £50–£100 per m²
- Typical time on site
- 2–4 working days
- Water
- Hard across most of East Sussex
- Survey
- Free, at your home
What does bathroom tiling cost in Rottingdean?
Guide price in Rottingdean: £50–£100 per m² including VAT, depending on the room and what you choose. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Ceramic
- Grout and trims
Porcelain
- Porcelain walls and floor
Large-format or stone
- Mitred edges, niches
Guide prices for Rottingdean including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Rottingdean
As well as Rottingdean itself (BN2 and BN10), we survey in Peacehaven, Brighton and Hove.
Rottingdean gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If you want a tiled shower floor in your Rottingdean bathroom, the tanking and drainage are planned before the tile is chosen. If your Rottingdean home has hard water, larger tiles and epoxy grout leave fewer joints for limescale to build up in.
Water across much of East Sussex is hard. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Fixing with an adhesive suited to the tile and the surface, with levelling clips for large tiles
- Floor preparation: overlaying timber floors with ply or backer board, or levelling a screed
- Tanking the shower area and the walls around the bath with a waterproof membrane or liquid system
- Checking walls for flatness and strength, and boarding with cement-based backer board where needed
Decisions to make first
Grout
Cement-based grout is standard. Epoxy grout resists stains and mould better and suits showers, but takes longer to apply and costs more.
Edges
Metal or PVC trims are quick and protect tile edges. Mitred edges look cleaner on porcelain and take more labour.
Rules that apply in England
In England, tiling itself is not building regulations work. If it is part of forming a level shower floor with new drainage, that drainage can be Part H work, and any new electrics are covered by Part P.

